as@emakgroup.ae

Working hours of the company:

MON - FRI: from 9:00 to 18:00

Order a call
Close
Article number: 77795006

Scaffolding post QES - CORONET

Description Flanges are installed on the post at intervals of 0.5 m, which serve to connect the crossbars and diagonal braces to form a one-piece construction of the QES scaffolding. The stand acts as a support for the structure. Surface Finishing hot dip galvanizing Options article no. Description Weight (kgs) QP9 9'9" QES Post 36.8 QP6 6'6" QES Post 25.3 QP3 3'3" QES Post 13.8
Description

Flanges are installed on the post at intervals of 0.5 m, which serve to connect the crossbars and diagonal braces to form a one-piece construction of the QES scaffolding. The stand acts as a support for the structure.

Surface Finishing

hot dip galvanizing

Options

article no. Description Weight (kgs)
QP9 9'9" QES Post 36.8
QP6 6'6" QES Post 25.3
QP3 3'3" QES Post 13.8

Product code 77795006

brand CORONET

Leave a request

Leave a request and our manager will contact you within an hour
callback
1
$settings->wid3get_name}
Emak Group

What can we offer you